H20 Timber Beam for Concrete Formwork Construction Formwork Girder

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Detailed Product Description



1.glued laminated timber beam

2.Max. Allowable shear force: 40KN, Max. Design value: 11KN;

3.Max. Allowable bending moment: 10KN·M, Max. Design value: 5KN·M.



Formwork Girder H20 Timber Beam for Concrete Formwork Construction


Description:

1. Structure sketch



2. Related parameters

① Max. Allowable shear force: 40KN, Max. Design value: 11KN;

  Max. Allowable bending moment: 10KN·M, Max. Design value: 5KN·M.

② Max. Production length: 6600mm;

  Production capacity: 3000m/day;

  Weight: about 4.8kg/m;

  Moisture Content: about 13% ;

  Using time: about 4-5 years.


Competitive Advantage:

1. Standardized production line guarantees good products.



2. Finger jointing of the flange and web,the strength of timber beam is highly improved.


 


3. Well treated to prevent from water penetration or erosion, so the service life
maximally extended.

Normally, CMAX timber beam H20 can be used for 4 to 5 years, the exact using time is influenced by construction environment and the way to storage.

4. The length will be flexible, we can afford any length to meet customs’ demand within 6.6m limit.



Applications:

As a kind of girder, it is an important constituent part for formwork and it is widely used in concrete formwork construction.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
Hot Searches
客服
live chat
H20 Concrete Formwork Beam